Top supercomputer race continues with NASA/SGI box
By
Robert McMillan
,
IDG News Service
, 10/26/2004
- Share/Email
- Tweet This
- Print
The space race may be over, but engineers at NASA's Ames Research Center Tuesday staked their claim in another type of challenge:
the never-ending contest to build the world's fastest supercomputer. At a ribbon-cutting ceremony at the NASA supercomputing
facility in Moffett Field, Calif., the U.S. space agency unveiled its 10,240 processor Linux-based supercomputer, named Columbia,
and cited benchmark numbers that show it performing faster than any other system.
Built in cooperation with Silicon Graphics (SGI) and Intel over the last four months, Columbia has achieved a sustained performance
of 42.7 teraflops, as measured by the Linpack benchmark used to rank the bi-annual Top 500 list of supercomputers. This result
puts it ahead of both Japan's Earth Simulator, which was benchmarked at 35.86 teraflops in June, and IBM's Blue Gene system, which was benchmarked at 36.01 teraflops last month.
NASA's 42.7 teraflop benchmark was achieved using only 16 of the 20 512-processor Altix systems that SGI built for the system,
officials said. A benchmark number based on Columbia's full performance will be released in early November at the SC 2004
high performance computing conference in Pittsburgh.
The system is already being used for a variety of tasks at NASA, including hurricane prediction and analyzing data from the
more than 60 space probes that the agency currently operates throughout the solar system.
Columbia, which is able to simulate phenomenon to a detail unmatched by NASA's current systems, will also play a critical
role in performing the simulations required to resume space shuttle missions, NASA officials said. Shuttle missions were halted
after the supercomputer's namesake, the Space Shuttle Columbia, broke apart during re-entry on Feb. 1, 2003, killing the vehicle's
seven crew members.
"All of the simulations for the redesigned shuttles are being done on these systems," said G. Scott Hubbard, director at NASA
Ames.
Officials at the ribbon cutting also cited national and regional interests as the impetus behind the system. Hubbard said
that the Columbia was remarkable not only for the speed at which it was built, but for the speed at which it managed to clear
the political hurdles required to secure funding. "Thanks to a lot of people, that all happened in a month," he said. "Can
you imagine moving the entire government in 30 days?"
The supercomputer will help the country maintain its leadership role in high technology, said Rep. Zoe Lofgren (D-Calif.)
speaking before the ribbon cutting. "We want to be number one," said Lofgren. "The fact that we are today is going to mean
a lot to our valley (Silicon Valley) and to our country."
The IDG News Service is a Network World affiliate.
Partner Content
www.bmc.com
Gartner 2009 Magic Quadrant for Job Scheduling
Gartner has positioned BMC CONTROL-M in the Leaders Quadrant of their "2009 Magic Quadrant for Job Scheduling." The report assesses the ability to execute and completeness of vision of key vendors in the marketplace. Read a full copy today, courtesy of BMC Software.
Download whitepaper
Dell's SMART Approach to Workload Automation
Read a compelling case study by EMA, Inc. to learn how Dell uses BMC CONTROL-M to cut cost and increase productivity with workload automation.
Download whitepaper
Workload Automation Cost Savings 2 Minute Video
A major computer manufacturer uses BMC CONTROL-M and just four people to schedule and run over 85,000 jobs every month. By switching to BMC CONTROL-M, they more than quadrupled the workload without adding a single staff member. See how in this 2-minute video overview.
Go to video
Comment