Skip Links

Network World

  • Social Web 
  • Email 
  • Close

(Comma separation for multiple addresses)
Your Message:

FCoE's 10Gbit/sec should be in your future

By John Webster , Computerworld , 04/05/2008
  • Share/Email
  • Tweet This
  • Comment
  • Print

It's highly likely that, if you follow the comings and goings of storage networking technology, then by now you've at least heard of the emerging Fibre Channel over Ethernet (FCoE) standard working its way through the INCITS process (see " New Fibre Channel over Ethernet standard proposed "). To level-set, FCoE is a method of encapsulating the packets that would normally flow across a Fibre Channel storage network (SAN) for transmission over Ethernet link. Think 10Gbps Ethernet for practical purposes. However, unlike other FC-to-Ethernet encapsulation methods like FCIP and iFCP, FCoE lives within the same OSI layer as IP, enabling enhanced performance, lossless frame transmission, and some other goodies.

FCoE fits nicely with the Data Center Transformation themes now playing at your favorite IT vendor's Web site. FCoE is all about the convergence of data center storage and data communications fabrics as 10 GbE rolls out-Ethernet for all and all for Ethernet.

Maybe the thought of combining storage I/O and networking fabrics within the data center has you chomping at the bit. On the other hand, maybe it doesn't. Either way, as the FCoE bandwagon parades across your screen, here are some questions worth considering:

Who within the data center operations group will manage the converged fabric? A converged fabric will require at least some convergence at the IT and data center staff level as well. Are you comfortable with that? Are you prepared for it?

Will you have to learn a new language? Sorry, but yes. Do you know what a CNA is? It's a Converged Network Adapter. Think of a CNA as being in the same general category as an HBA. Does it work like an HBA? Sorta. Then there's Data Center Ethernet, otherwise known as Converged Enhanced Ethernet (CEE)-- two competing names for the same standard. Hey, just what everyone needs-new acronyms!

Will due diligence be required? You bet. Expect needing to investigate interoperability, drivers, cabling, connectors, standards versioning, FICON support, buffer credits, etc. etc. etc.

Will FCoE cost more than FC? Yes, at least in the beginning. I expect CNAs for example to cost a bit more than FC HBAs, but not substantially more. Economies of scale and competitive pricing will start to kick in at some point, assuming even modest adoption by users of FCoE. Why? Both FC and Ethernet vendors are lining up behind the FCoE standard.

  • Share/Email
  • Tweet This
  • Comment
  • Print

Partner Content

Gartner 2009 Magic Quadrant for Job Scheduling

Gartner has positioned BMC CONTROL-M in the Leaders Quadrant of their "2009 Magic Quadrant for Job Scheduling." The report assesses the ability to execute and completeness of vision of key vendors in the marketplace. Read a full copy today, courtesy of BMC Software.

Download whitepaper

Dell's SMART Approach to Workload Automation

Read a compelling case study by EMA, Inc. to learn how Dell uses BMC CONTROL-M to cut cost and increase productivity with workload automation.

Download whitepaper

Workload Automation Cost Savings 2 Minute Video

A major computer manufacturer uses BMC CONTROL-M and just four people to schedule and run over 85,000 jobs every month. By switching to BMC CONTROL-M, they more than quadrupled the workload without adding a single staff member.  See how in this 2-minute video overview.

Go to video

Comment
Login
Forgot your account info?
Add comment
Anonymous comments subject to approval. Register here for member benefits.
Have a NetworkWorld account? Log in here. Register now for a free account.

Videos

rssRss Feed