Skip Links

Network World

  • Social Web 
  • Email 
  • Close

(Comma separation for multiple addresses)
Your Message:

Easing network congestion caused by virtual servers

By Deni Connor , CIO , 05/09/2008
  • Share/Email
  • Tweet This
  • Comment
  • Print

Virtual servers may make the utilization of physical servers more efficient, but that efficiency comes with a price. The physical servers that support virtual machines (VMs) have to be more powerful. Less obviously, they also need better input/output (I/O) capability than standalone machines, which means more cabling to connect the virtual machines to the network switch and more switch ports to accommodate the increased number of virtual machines contending for the network's resources.

"Virtualization is about consolidation and concentration," says Bernd Herzog, an analyst at research firm Application Performance Management Experts. "It takes many disparate and distributed systems and concentrates them together onto a relatively few physical servers, and therefore onto a much smaller set of network pipes and storage area network (SAN) access infrastructure. "

According to Gartner, four million virtual machines will exist by 2009. IDC (a sister company to CXO Media) predicts that by 2010, 14.6 percent of servers shipped will host VMs.

A number of companies are addressing the impact of server virtualization on the IP and storage networks. Gear6 and Xsigo have both introduced hardware products in recent months that virtualize I/O operations, much as VMware, Citrix XenServer and Microsoft Virtual Server allow the virtualization of the server's CPU.

Each has taken a different approach to virtualizing I/O between servers and the network.

Gear6's CACHEfx appliance, which was introduced in May 2007, uses random access memory to provide a virtualized I/O environment for data that applications need to retrieve and process quickly.

As server speeds increase and as more virtual machines are placed on physical servers, applications become I/O bound.

"Pre-virtualization, IT shops had one physical server with one I/O channel," says Gary Orenstein, VP of marketing for Gear6. "There was complete synchronization between the application, the operating system, the motherboard, the I/O driver and the I/O link. As soon as they put multiple virtual machines on that link, none of them is coordinated with the other. If they had virtual machines, all the VMs were grasping for that link simultaneously without coordination."

Xsigo takes a different approach: Its I/O Director, which debuted at VMworld last fall in San Francisco, lets IT control I/O between servers and the network by creating virtual I/O channels that can be used by applications and other processes.

The virtualization of I/O with the use of the I/O Director, according to the company estimates, allows IT departments to reduce cabling between servers and the network by as much as 70 percent and reduce their connectivity costs to network and storage switches by up to 50 percent.

Dr. James Zhu, CIO of Alcatel Shanghai Bell in China, is planning to deploy a Xsigo I/O Director in his data center when it opens this June.

"The value we recognize is that the I/O Director can reduce our cabling and network interface card cost," Zhu says. "More importantly, we can change our server's I/O configuration without changing the network configuration and [in doing so] reduce our operating and capital expense costs."

  • Share/Email
  • Tweet This
  • Comment
  • Print

Partner Content

Gartner 2009 Magic Quadrant for Job Scheduling

Gartner has positioned BMC CONTROL-M in the Leaders Quadrant of their "2009 Magic Quadrant for Job Scheduling." The report assesses the ability to execute and completeness of vision of key vendors in the marketplace. Read a full copy today, courtesy of BMC Software.

Download whitepaper

Dell's SMART Approach to Workload Automation

Read a compelling case study by EMA, Inc. to learn how Dell uses BMC CONTROL-M to cut cost and increase productivity with workload automation.

Download whitepaper

Workload Automation Cost Savings 2 Minute Video

A major computer manufacturer uses BMC CONTROL-M and just four people to schedule and run over 85,000 jobs every month. By switching to BMC CONTROL-M, they more than quadrupled the workload without adding a single staff member.  See how in this 2-minute video overview.

Go to video

Comment
Login
Forgot your account info?
Add comment
Anonymous comments subject to approval. Register here for member benefits.
Have a NetworkWorld account? Log in here. Register now for a free account.

Videos

rssRss Feed