- Microsoft Windows chief decries standards grandstanding
- The 5 best, and 5 worst, features of Google Chrome OS
- Federal government using PS3 to crack pedophile passwords
- 10G Ethernet cheat sheet
- Top 10 free Windows tools for IT pros, at a glance
Rackable Systems announced new rack-mount servers on Monday that aim to provide more processing power while reducing power consumption and taking up less space.
The high-density servers pack two motherboards into a 2U unit with a single power supply, increasing the available processing power while consuming less energy, the company said.
Most servers today have one server board and one or two power supplies, said Geoff Noer, senior director of product marketing and management at Rackable. With the new servers two boards share one power supply.
Putting multiple server boards on a single power supply gives better power efficiency when the servers are running at peak load, according to Noer. Rackable's previous servers all came with one power supply per board.
With no redundant power supply option, a power supply failure would affect both connected boards, Noer said. However, data centers would deal with half as many power-supply problems, and large-scale server deployments will be able to absorb the downtime, Noer said.
The new servers, the XE2004-SC1, XE2006-SC1 and XE2006-F1, come with dual-socket boards and support Intel Xeon or Advanced Micro Devices Opteron dual-core and quad-core processors. The AMD-based boards support up to 64G bytes of memory, and the Intel-based boards support up to 48G bytes of memory.
Another server, the XE2208-SC1, is designed to be used in Rackable System's modular data center, called Ice Cube, and includes two power supplies to handle four dual-socket Intel-based boards. The other servers can also be used with Ice Cube.
The modular data centers, built in 40-foot corrugated metal shipping containers, will be able to house 700 of Rackable's 2U servers, The servers are fanless because the containers use water cooling instead. With the XE2208-SC1, the modular data could contain up to 22,400 processor cores.
Baylor College of Medicine, which uses servers from multiple vendors including Rackable for its human genome project, is considering buying the new servers, said David Parker, director of information systems.
"The new servers will give me more density. I've got very limited floor space so the more things I can jam in a rack, the better off I am," Parker said.
Parker said previous servers he bought from Rackable saved him 26 percent in power costs compared to servers from other vendors. Baylor needs the fastest CPUs it can get for image processing for the genome project, but it may buy other servers from Rackable later this year with low-power processors for virtualization applications, he said.
The new servers will be available worldwide in the next month. Pricing information wasn't immediately available.
Partner Content
www.bmc.com
Gartner 2009 Magic Quadrant for Job Scheduling
Gartner has positioned BMC CONTROL-M in the Leaders Quadrant of their "2009 Magic Quadrant for Job Scheduling." The report assesses the ability to execute and completeness of vision of key vendors in the marketplace. Read a full copy today, courtesy of BMC Software.
Download whitepaper
Dell's SMART Approach to Workload Automation
Read a compelling case study by EMA, Inc. to learn how Dell uses BMC CONTROL-M to cut cost and increase productivity with workload automation.
Download whitepaper
Workload Automation Cost Savings 2 Minute Video
A major computer manufacturer uses BMC CONTROL-M and just four people to schedule and run over 85,000 jobs every month. By switching to BMC CONTROL-M, they more than quadrupled the workload without adding a single staff member. See how in this 2-minute video overview.
Go to video
Comment