Skip Links

Network World

  • Social Web 
  • Email 
  • Close

(Comma separation for multiple addresses)
Your Message:

IBM to build new monster supercomputer

By Tom Jowitt, TechWorld
February 04, 2009 10:10 AM ET
  • Share/Email
  • Tweet This
  • Comment
  • Print

IBM is to build a hugely powerful supercomputer capable of performing at 20 petaflops per second, twenty times faster than the current record holder, namely the 1 petaflop Roadrunner machine it delivered back in June to Lawrence Livermore National Laboratory.

IBM has been contracted by the US government to build the machine, dubbed Sequoia, and is still developing the technology needed. It has also been asked to build a smaller computer called Dawn. Both machines will be constructed at its Blue Gene facilities in Rochester, Minnesota.

According to Big Blue, Sequoia will have the power of 2 million laptops. Its closest rival, the world's first petaflop machine, Roadrunner, can only perform at speeds equivalent to 100,000 laptops combined.

Understandably, a machine of this nature will occupy a lot room, namely 3,422 square feet (or 318 square metres). That is roughly the size of a large house, and although IBM claims it will be highly energy-efficient for the job it does, machines of this nature consume tremendous amounts of electricity and it is expected to occupy 96 refrigerator-sized racks.

Inside the beast itself, Sequoia is expected to contain more than 1.6 million processors, thought to be IBM Power chips. The system is also reportedly to have 1.6TB of memory and will run Linux. The open source operating system commands approximately 85 percent market share in the high performance computing field. Windows meanwhile is relegated to less than five percent market share, according to industry estimates.

The smaller machine, Dawn, is expected to be a 500-teraflop computer. A teraflop equals a trillion floating points a second; a petaflop meanwhile is 1,000 trillion (one quadrillion) sustained floating-point operations per second.

Sequoia will be used for simulating nuclear tests by the US Department of Energy at the Lawrence Livermore National Laboratory. Supercomputers are necessary for this task, as it allows scientists judge the safety and reliability of the US nuclear weapons stockpile without doing live tests.

That said, Sequoia should have peacetime applications as well, namely weather forecasting or oil exploration. And the ability to conduct multi-scale science simulations would also allow, say, the pharmaceutical industry to simulate the effect of drugs on the human body, or by Wall Street to simulate the impact of events on the stock market.

IBM has a rich history in the supercomputer sector, and has been building supercomputers for more than 50 years now. It dominates the Top 500 supercomputer rankings, and Big Blue believes that the 20-petaflop computing power of Sequoia will be so powerful, it will exceed the combined systems of every machine on the Top 500.

The Sequoia machine is slated for delivery sometime in 2011.

IBM did not reveal what it would cost, although one can safely assume that if you need to know the price, you almost certainly couldn't afford it.

  • Share/Email
  • Tweet This
  • Comment
  • Print

Partner Content

Gartner 2009 Magic Quadrant for Job Scheduling

Gartner has positioned BMC CONTROL-M in the Leaders Quadrant of their "2009 Magic Quadrant for Job Scheduling." The report assesses the ability to execute and completeness of vision of key vendors in the marketplace. Read a full copy today, courtesy of BMC Software.

Download whitepaper

Dell's SMART Approach to Workload Automation

Read a compelling case study by EMA, Inc. to learn how Dell uses BMC CONTROL-M to cut cost and increase productivity with workload automation.

Download whitepaper

Workload Automation Cost Savings 2 Minute Video

A major computer manufacturer uses BMC CONTROL-M and just four people to schedule and run over 85,000 jobs every month. By switching to BMC CONTROL-M, they more than quadrupled the workload without adding a single staff member.  See how in this 2-minute video overview.

Go to video

Comments (10)
Login
Forgot your account info?

FloppityBy Systems Dude on February 4, 2009, 11:57 amFlops *are* per second, FLoating-point Ops Per Second. Your first sentence has this per second per second, or seconds squared, which means that the computer is...

Reply | Read entire comment

Ok, so we're screwed.By Anonymous on February 4, 2009, 12:22 pmUm... Terminator anyone? Skynet?

Reply | Read entire comment

new tech?By Anonymous on February 4, 2009, 12:47 pmwhen i read the first sentece i was confused my self......i thought "IBM is creating a machine which calculations accelerates? 0_0 ? wow. and then too thought it...

Reply | Read entire comment

Sounds Great, but...By Anonymous on February 4, 2009, 12:58 pm...can it run Windows Vista?

Reply | Read entire comment

re: Ok, so we're screwedBy Anonymous on February 4, 2009, 1:33 pm"The Sequoia machine is slated for delivery sometime in 2011." and the world will in in 2012...

Reply | Read entire comment

supercomputersBy Anon on February 4, 2009, 4:10 pmthe supercomputer sound like a great idea, the only problem is who pay for the "Creation of the Beast?"

Reply | Read entire comment

View all comments

Add comment
Anonymous comments subject to approval. Register here for member benefits.
Have a NetworkWorld account? Log in here. Register now for a free account.

Videos

rssRss Feed