Skip Links

Network World

  • Social Web 
  • Email 
  • Close

(Comma separation for multiple addresses)
Your Message:

Silver Peak ups WAN acceleration ante

Silver Peak's NX-9000 is focused on high volume data environments such as SAN replication
Storage Alert By Deni Connor , Network World , 05/27/2008
Sign up for this newsletter now!

Storage analyst Deni Connor focuses on storage, application and infrastructure management in this twice-weekly newsletter.

  • Share/Email
  • Tweet This
  • Comment
  • Print

Silver Peak last week rolled out what it claims to be the first Gigabit WAN acceleration product, the NX-9000.

The NX-9000 supports up to 4Gbps of bi-directional LAN traffic and 1Gbps of bi-directional WAN traffic, along with 8TB of local data store available for deduplication of WAN data. It has 4 to 10 times the throughput of other competitive offerings, according to Silver Peak’s claims.

The NX-9000 includes two 10Gbps interfaces and four 1Gbps interfaces. It has EtherChannel bonding for physical connectivity between Silver Peak appliances and network elements. The NX-9000 supports over 256,000 simultaneous TCP flows, allowing hundreds of remote offices to be connected to a single appliance.

The appliance performs encryption of data in hardware and optimizes TCP and UDP traffic. It also accommodates latency sensitive traffic generated by Citrix or data replication and applications with dynamic data formats such as AutoCAD and Microsoft Excel.

The NX-9000, the largest in Silver Peak’s family of WAN acceleration appliances, is focused on high volume data environments such as SAN replication, and on access to centralized databases, video streaming and application delivery.

It’s WAN deduplication process – called Network Memory – works with latency sensitive traffic and both TCP and non-TCP applications.

The appliance addresses out of order and lost packets using adaptive Forward Error Correction and Packet Order Correction. In addition it is possible to set QoS requirements.

The appliance competes with Riverbed and Cisco.

The NX-9000 starts at $260,000 and is expected to be available in August.

Deni Connor is principal analyst for Storage Strategies NOW and host of both the Masters of Storage and Masters of Servers Solution Centers.

  • Share/Email
  • Tweet This
  • Comment
  • Print
Partner Content

Gartner 2009 Magic Quadrant for Job Scheduling

Gartner has positioned BMC CONTROL-M in the Leaders Quadrant of their "2009 Magic Quadrant for Job Scheduling." The report assesses the ability to execute and completeness of vision of key vendors in the marketplace. Read a full copy today, courtesy of BMC Software.

Download whitepaper

Dell's SMART Approach to Workload Automation

Read a compelling case study by EMA, Inc. to learn how Dell uses BMC CONTROL-M to cut cost and increase productivity with workload automation.

Download whitepaper

Workload Automation Cost Savings 2 Minute Video

A major computer manufacturer uses BMC CONTROL-M and just four people to schedule and run over 85,000 jobs every month. By switching to BMC CONTROL-M, they more than quadrupled the workload without adding a single staff member.  See how in this 2-minute video overview.

Go to video

Comment
Login
Forgot your account info?
Add comment
Anonymous comments subject to approval. Register here for member benefits.
Have a NetworkWorld account? Log in here. Register now for a free account.

Videos

rssRss Feed
Partner Content

Gartner 2009 Magic Quadrant for Job Scheduling

Gartner has positioned BMC CONTROL-M in the Leaders Quadrant of their "2009 Magic Quadrant for Job Scheduling." The report assesses the ability to execute and completeness of vision of key vendors in the marketplace. Read a full copy today, courtesy of BMC Software.

Download whitepaper

Dell's SMART Approach to Workload Automation

Read a compelling case study by EMA, Inc. to learn how Dell uses BMC CONTROL-M to cut cost and increase productivity with workload automation.

Download whitepaper

Workload Automation Cost Savings 2 Minute Video

A major computer manufacturer uses BMC CONTROL-M and just four people to schedule and run over 85,000 jobs every month. By switching to BMC CONTROL-M, they more than quadrupled the workload without adding a single staff member.  See how in this 2-minute video overview.

Go to video