Companies don't need to build a whole new data center to begin saving on energy. Below are some steps recommended by Burton Group analyst Andrew Kutz that enterprises can take in their existing data centers to save on power consumption:

1. Cut the physical number of servers through high-density options, such as blade servers, and through virtualization.

2. Reduce storage hardware by using SANs or other NAS devices that consolidate storage space. Consolidation of physical units greatly affects the amount of power consumed by the data center and can also represents lower-acquisition costs.

3. Look for energy-efficient hardware such as multicore CPUs that reduce redundant and external electronics and therefore save on energy.

4. Check out CPU performance-stepping technology that dynamically adjusts the energy that processors require in relationship to processor load.

5. Dynamic control of a server's internal fans can reduce the energy needed when the air in the data center is cooler.

6. Liquid cooling of server racks can limit the amount of energy needed to remove heat from the data center.

7. Follow the hot aisle/cold aisle layout for arranging equipment in the data center. Although this technique dates to the mid-1990s, "it's extremely effective," Kutz says.

The design lets cool air flow through the aisles to the servers' front-air intake, and lets hot air flow from the back of servers to the AC return ducts, therefore requiring less energy for cooling.

8. Look for software that is multithreaded to take advantage of multicore-processor machines. "Today you can buy a new server out-of-the-box that is multicore, but the software's not written for it, so you can't take advantage," Kutz says. "This falls in the lap of the software designers, they need to make sure their software is multithreaded to take advantage of multiprocessor machines."

NOTE: View a Burton Group podcast that expands on this topic. 

Slideshow: Take a closer look at SDSC's green data center


< Previous story: Inside a green data center | Next story: Creature comforts >

  • Share/Email
  • Tweet This
  • Comment
  • Print

Partner Content

Gartner 2009 Magic Quadrant for Job Scheduling

Gartner has positioned BMC CONTROL-M in the Leaders Quadrant of their "2009 Magic Quadrant for Job Scheduling." The report assesses the ability to execute and completeness of vision of key vendors in the marketplace. Read a full copy today, courtesy of BMC Software.

Download whitepaper

Dell's SMART Approach to Workload Automation

Read a compelling case study by EMA, Inc. to learn how Dell uses BMC CONTROL-M to cut cost and increase productivity with workload automation.

Download whitepaper

Workload Automation Cost Savings 2 Minute Video

A major computer manufacturer uses BMC CONTROL-M and just four people to schedule and run over 85,000 jobs every month. By switching to BMC CONTROL-M, they more than quadrupled the workload without adding a single staff member.  See how in this 2-minute video overview.

Go to video

Comment
Login
Forgot your account info?
Add comment
Anonymous comments subject to approval. Register here for member benefits.
Have a NetworkWorld account? Log in here. Register now for a free account.

Videos

rssRss Feed